
Ren Cen
The Renaissance Center in Detroit required specialized valve solutions for its large-scale HVAC and steam systems serving one of the largest commercial complexes in the Midwest.
The Challenge
The building's critical heating infrastructure needed valve upgrades that could handle high-pressure steam while minimizing disruption to the occupied commercial spaces.
Our Solution
RJM supplied Zwick triple-offset butterfly valves and gate valves rated for the building's high-pressure steam system, coordinated for phased installation during low-occupancy periods.
The Result
Successfully upgraded the building's steam valve infrastructure with zero unplanned outages, improving system reliability and reducing ongoing maintenance requirements.